The scope of work will require the east driveway to get shut for that period of construction which is predicted to conclude early March 2021. Ambulance traffic will carry on to get usage of the FSED by using the west driveway on East Bay Travel. Joe Romanowski was familiar with https://pbase.com/rjmurphyconsca/r_j_murphy_construction_inc