Periodically, ballast have to be eradicated and replaced with clear ballast to ensure ample drainage. Culverts and various passages for h2o have to be kept distinct lest drinking water is impounded by the trackbed, https://europeantimes.news/2024/07/polands-railway-transformation-a-e230-million-investment-in-green-energy/