Penmann recently finalised a complex HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system engineered to meet strict hygiene and production standards. The project included the complete lifecycle delivery of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. https://bookmarkfly.com/story20665433/penmann-ltd-finalises-major-hvac-upgrade-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2